CB24 · Histon · Cambridge
Kitchens in Histon
We design and build kitchens for Cambridge homes — from a refit within an existing footprint to an extended rear kitchen wrapped around a courtyard.

Histon · CB24
Histon
Working in Histon.
Histon and Impington — north of Cambridge, a village pair with substantial inter-war and post-war family houses, generous gardens, and growing demand for kitchen extensions and garden rooms.
Histon is largely outside the conservation area, with good scope for permitted development. We've worked on a series of side returns and rear extensions here.
What we do
Kitchens we build in Histon.
- —Designed kitchens with bespoke joinery
- —Kitchen extensions (rear, side return, wraparound)
- —Stone and engineered worktops, brass and matte ironmongery
- —Appliance specification (Miele, Gaggenau, Wolf, Sub-Zero)
- —Plumbing, electrics, ventilation and lighting design
- —Existing-footprint refits without structural work
Recent work nearby
Projects from nearby villages.
Also in Histon
Other things we do in Histon.
Extensions in Histon
Rear, side, wraparound and two-storey extensions, drawn and built by one team.
ExploreBathrooms in Histon
Family, en-suite, principal and wet rooms — stone, brass and considered detail.
ExploreGarden Rooms in Histon
Garden offices, studios, gyms and annexes — built like a house, not a shed.
ExploreCommon questions
About kitchens in Histon.
- Do you make the cabinetry yourselves?
- We work with two Histon-based joinery workshops we've used for years. We also fit kitchens from Plain English, deVOL, Pluck and other specified makers when a client has a preference.
- How much does a Histon kitchen typically cost?
- Designed kitchens in the homes we work on usually run £40k–£120k including joinery, stone, appliances and install. A simple refit can sit below that range; a kitchen-in-extension above it.
- Can you specify appliances?
- Yes. We work most often with Miele, Gaggenau, Wolf and Sub-Zero, and we'll specify against your cooking habits — not the showroom upsell.
- How long does a kitchen take?
- Eight to twelve weeks of design, then four to eight weeks on site for an existing-footprint refit. Kitchens within an extension run with the wider programme.

